Kanal VarnaDrains • Leaks • Thermal imaging • Plumbing
Bathroom during renovation with tiles removed, an old sink and an exposed drain pipe by the floor

Drain survey before renovation in Varna: look at the pipes before they are tiled over

Tiles, screed and kitchen units close in the drain pipes for years. A camera check before the renovation tells you what can stay and what should be replaced while everything is still open.

Our clients on video · all videos (in Bulgarian)

From €59Camera inspection of the drain
Best momentOld fittings off, new screed not yet laid
Live on screenYou and your builder watch with us
06:00–23:00Every day, weekends included
1000+ clients served 30+ years in the trade Price agreed before we start 06:00–23:00 every day
In short

Before you renovate a bathroom, kitchen or floor in Varna, it is worth looking with a camera at the drain that will stay under the new tiles. A drain survey before renovation shows whether the old pipe is cracked, sagging or coated with deposits, while you can still replace it without breaking anything new. The camera inspection is from €59, and the picture is on a screen in front of you. Call +359 52 993 333 or email info@kanalvarna.com — write to us in English and we reply in English. We work every day from 06:00 to 23:00.

Updated November 2026

Why check the drain before the renovation, not after

If the drain pipe under your new floor is cracked, sagging or clogged with deposits, you find out only once everything is new, and then the new tiles have to come up. A camera check is usually one visit. It looks at the drain pipes of the room you are renovating from the toilet outlet, the floor drain or an inspection hatch (a covered opening for cleaning the pipe), as far as the soil stack or the manhole in the yard.

The camera shows cracks and displaced joints, a section where water stands, greasy build-up, roots in a yard pipe, and debris from earlier building work such as adhesive, plaster and bits of tile. It does not measure slope and it does not see through walls: it shows the old pipe from the inside. That helps you decide whether the pipe should be replaced. How the new pipe will run, and at what slope, is for your plumber to decide on site. The general method is on CCTV drain survey.

A drain camera and a thermal camera are different tools. The drain camera goes into the pipe and shows whether it is blocked or cracked. A thermal camera and a moisture meter look for leaks in the wall and floor from the outside: see leak detection. Before a bathroom renovation you sometimes need both. Tell us what worries you and we suggest which.

Bathroom: toilet, floor drain, bath and shower before the new tiles

Bathroom during renovation with tiles removed, an old sink and an exposed drain pipe by the floor

More drain pipes run under a bathroom floor than anywhere else in a flat: from the toilet, the floor drain, the bath or shower and the basin, all joining the soil stack. In older buildings some may be cast iron. The best moment for the camera is when the old tiles and the toilet are off and the new waterproofing is not yet laid.

  • The toilet connection — whether the rubber collar where the toilet enters the pipe is whole, and whether the pipe is cracked. If it only drains slowly, see blocked toilet.
  • The floor drain and the pipe after it — build-up, hair, soap and standing water. If the drain is merely slow, see blocked floor drain.
  • The line from the bath or shower — especially if you are building a walk-in shower with a drain in the floor: the old pipe is checked before your plumber decides how the new one will run.
  • The link to the soil stack — normally a shared part of the building, so the building manager is involved; see blocked soil stack.
  • Debris from earlier building work — adhesive, grout and plaster tipped down the drain.

When only the toilet is being replaced, the old one comes off and the drain opening is exposed. That is the easiest moment to put the camera in, without breaking any tiles. If it shows a cracked collar, old cast iron or thick build-up by the stack, you can decide to replace the pipe while the toilet is off. The new pipes, waterproofing and fittings themselves are the plumber's work.

Kitchen: the sink and dishwasher line before the new units

Empty kitchen before the units are fitted, with water and drain pipes coming out of the wall

A kitchen drain is narrower and collects grease. If the sink stays where it is, the camera shows how much build-up there is and whether the line should simply be cleared or replaced before the new units are fitted. If the sink moves to another wall, the pipe will be longer and your plumber has to give it a slope; the camera only shows whether the old line it connects to is sound. While the wall is bare, you can see where the drain comes out and reach the old pipe easily.

The dishwasher and the washing machine join the same drain. If the line was already slow, tell us: see also washing machine not draining.

Under a new floor, and before a sale or a let

Tiler spreading adhesive on a floor with a notched trowel

Once adhesive and tiles are down, the pipes under the floor can no longer be seen, so the drain is looked at first. On a ground floor or in a house, pipes sometimes run under the floor of other rooms too, not only the bathroom. A separate check is whether the base is dry, with a moisture meter, not by eye. If you are putting in wet underfloor heating, its pipes normally lie above the old drain pipes and make the drain hard to reach later, so check it first.

Before a flat is sold or let, a quick refresh is common: paint, new tiles over old, a new sink or toilet. If the drain under them is slow or smells, the new owner or tenant may call soon after moving in. A check before the refresh shows whether the drain needs clearing or replacing, and you can tell the buyer what has been checked. If you also want to know about leaks and damp in the walls, see property check. For a house, the drain line continues under the yard to the manhole, where roots and sagging pipes are common: see blocked outside drain.

Tell us which room, when the builders start and whether the drain has been slow — we agree the check before the new tiles.

📞 +359 52 993 333

Which renovation needs what

RenovationWhat we look atBest moment
BathroomToilet, floor drain, bath or shower, link to the stackAfter the old tiles come off
KitchenThe line from the sink to the stackBefore new units and worktop
Sink on a new wallThe old line the new one will joinBefore the plumber decides the route
New toiletThe opening and the pipe behind itWhile the old toilet is off
New floor, ground floor or houseLines we can reach: toilet, floor drain, hatchBefore the new screed
House with a yardThe line to the manhole or the streetBefore the concrete of a path or yard

How the survey goes

  1. Tell us the dates. Which room, which floor or house, and whether you know what the pipes are made of. Contact us as soon as you know when the works start.
  2. A convenient day. The best time is when the old fittings are off and the new screed is not laid. If you have not started, we agree the day in advance.
  3. Clearing first, if needed. A camera cannot see the pipe walls through standing water or silt. If the line is slow, we clear it with a spiral first.
  4. The camera. We go in through the toilet opening, the floor drain or an inspection hatch. You watch the screen with us. If possible, your builder should be there too: they see the same picture and can decide how the new pipes will run.
  5. What to replace. We tell you on site what can stay and what should be replaced. If you decide, we can take on the whole job with craftsmen we work with; equipment we do not have we arrange with partners.

We work every day from 06:00 to 23:00 and tell you when we can come once we know the dates. We do not go out after 23:00. If the work ends up including a new pipe, book a second look in advance, before everything is closed up again, so nothing has to be broken open a third time.

When you do not need a survey

  • The renovation is only painting or plastering and the drain is not touched.
  • The pipes in the room were replaced recently, drain well, do not smell and have never blocked.
  • The problem is water on a wall or ceiling, not a slow drain. That calls for leak detection, not a drain camera.

If the drain has blocked more than once, or the bathroom smells of drains, a check is sensible even for a small job. All kinds of blockage are on our blocked drains page.

If you own the flat and are not in Bulgaria

Many owners renovate a flat from abroad before letting it. The camera picture is watched on site, so ask your builder or property manager to be there; they see what we see and can decide on the pipes. We also give you the camera recording, which you can show your builder too; if we write a report, we attach it. Email us the address, the room and the start date, and the contact of whoever will meet us. We write to you in English with what we saw, you decide, and you can pay by bank transfer.

Frequently asked questions

Should you come before or after the demolition?

The best time is when the old toilet and traps are off but the new screed and waterproofing are not yet laid. The openings are exposed, the camera goes in easily, and if a pipe has to be replaced nothing new is damaged. Contact us as soon as you know the dates.

Does the drain have to be clear for the camera?

Yes. Through standing water and silt the camera cannot see the pipe walls. If the line is slow or blocked, we clear it with a spiral first and then run the camera. If clearing is easy, it all happens in one visit.

Will the drain camera also find a leak in the wall?

No. It shows the pipe from the inside. A leak in the wall or under the tiles is looked for with a thermal camera and a moisture meter, a separate inspection that can be booked together with the drain check.

What if the camera shows a cracked pipe?

We show you the spot on the screen and say what should be replaced. The decision is yours. If you want, we take on the whole job with craftsmen we work with. We give you the price before we start, once you have described the work or sent photos.

How much does it cost?

A camera inspection of the drain starts from €59. The final price depends on whether the line is blocked, how long it is and where we can get in: the toilet opening, the floor drain, a hatch or a manhole. See our price list.

I'm not in Bulgaria. Can you still deal with it?

Yes, as long as someone can be there to meet us and watch the screen: your builder, property manager or a neighbour. You get the camera recording afterwards. Send us the address and their contact; we arrange the visit with them.

Can I contact you in English?

Yes — write to us in English by email at info@kanalvarna.com or through the form on this page, and we reply in English. The phone number is +359 52 993 333.

Renovation coming up?

Tell us which room, when the builders start and whether the drain has been slow — we agree the check before the new tiles.

📞 +359 52 993 333

or email info@kanalvarna.com — write in English and we reply in English.

Send us a message

Leave your name and a phone number with the country code. Add your email if you prefer a written reply — write in English and we reply in English. We confirm the price before any work starts.

📞